LEE International
Lee Engineering Enterprises International
Check.gif (662 bytes)Engineers Check.gif (662 bytes)Scientists Check.gif (662 bytes)Contractors Check.gif (662 bytes)Planners Check.gif (662 bytes)Program Managers

MUNICIPAL FACILITIES

paloalto.jpg (9486 bytes)

CONSTRUCTION SERVICES FOR SEISMIC UPGRADES

Location: Palo Alto, California

Client: City of Palo Alto


The City of Palo Alto, in order to conform to the State's structural requirements, contracted LEE to provide construction services for the seismic upgrades of the police facility.  The upgrades covered approximately 20,000 square feet of the facility.  The structural upgrades required that LEE drill dowels through 5 feet of concrete to install the reinforcing steel.  This work required specialized care in the drilling process.  The drilling was performed around post-tensioning concrete beams (and severance in these beams could cause the damage to the existing structure).

Another unique aspect tot this project was the use of architectural concrete.  This type of concrete has a very specialized type of ad mixture and was poured into place from the bottom up.   Specialized plywood forms with high strength ties were used to insure the concrete set properly.

This project was completed on-time and within budget constraints which were originally agreed upon by the City and LEE.

NEXT PROJECT >