Project Reference
|
General Description of Project
|
Treatment Technologies Employed
|
Portion of Work by LEE
|
Project
Dates |
|
Start
|
Finish |
Prolinx
San Jose, CA |
20 gpm Closed
Loop system |
Ion exchange regeneration
system |
Design, equipment, manufacturing,
startup, training |
1997 |
1997 |
ISOLA USA
Fremont, CA |
10 gpm Closed
Loop system |
Ion exchange off site regeneration |
Design, equipment, manufacturing,
startup, training |
1997 |
1997 |
ISOLA USA
N Carolina |
10 gpm |
Ion exchange off site regeneration |
Design, equipment, manufacturing,
startup, training |
1997 |
1997 |
Extended Length Flex Corporation
Redwood City, CA |
Treatment of wastewater from
printed circuit board manufacturing (water recycling) |
Ion exchange; electro recovery |
Treatability study; design
& construction |
1992 |
1993 |
General Dynamics
Sunnyvale, CA |
Treatment of wastewater containing
heavy metals and organic substances |
Ion exchange; vacuum evaporation |
Treatability study |
1989 |
1989 |
Mektec, Inc.
Milpitas, CA |
Treatment of wastewater chemical
delivery system for production of copper waste over 3,000 ppm sludge dewatering
high purity water supply |
Chemical treatment; vacuum
evaporation; sludge dewatering; ion exchange; activated carbon absorption;
UV disinfection |
Treatability study; design
& construction |
1988 |
1989 |
Amtronics, Inc.
San Jose, CA |
Treatment of printed circuit
manufacturing waste |
Chemical treatment; sludge
dewatering |
Turnkey |
1985 |
1985 |
Santa Clara Circuits
North Redmond, WA |
Treatment of printed circuit
board manufacturing waste |
Chemical treatment of heavy
metals with complex agents; sludge dewatering |
Treatability study; design
& construction |
1985 |
1985 |
| Sanmina, Inc |
Treatment of printed circuit
board manufacturing waste |
Chemical treatment; sludge
dewatering |
Turnkey |
1984 |
1985 |
Citation Circuits
Stockton, CA |
Treatment of printed circuit
manufacturing waste |
Chemical treatment; sludge
dewatering |
Turnkey |
1984 |
1984 |
Bay Area Circuits
Redwood City, CA |
Treatment of printed circuit
manufacturing waste |
Chemical treatment; sludge
dewatering |
Turnkey |
1984 |
1984 |
Sigma Circuits
Costa Mesa, CA |
Treatment of hexavalent chromium,
removal of heavy metal; sludge dewatering |
Chemical treatment; sludge
dewatering |
Treatability study, design,
construction, startup and training |
1984 |
1984 |
South
Bay Intl.
San Jose, CA |
Treatment of printed circuit
board manufacturing waste |
Chemical treatment of heavy
metal; vacuum filtration of sludge |
Treatability study, design,
construction, startup and training |
1984 |
1984 |
Advanced Printed Circuit
Tech.
Tempe, AZ |
Treatment of printed circuit
board manufacturing waste |
Chemical treatment of heavy
metals with complex agents; sludge dewatering |
Treatability study, design,
construction, startup and training |
1984 |
1984 |
Zycon
Inc.
Santa Clara,
CA |
Treatment of printed circuit
board manufacturing waste |
Chemical treatment of heavy
metals with complex agents; sludge dewatering |
Treatability study, design,
construction, startup and training |
1984 |
1984 |
Martex Circuits
Mountain View, CA |
85 MGD plant to remove copper
and lead from printed circuit board manufacturing wastes |
Chemical treatment of heavy
metals with complex agents; sludge dewatering |
Treatability study, design,
site preparation, parking lot & landscaping design; design, manufacture
& installation of equipment; construction & maintenance services |
1983 |
1984 |
Sigma Circuits
Santa Clara/Costa Mesa, CA |
Two plants, 125 &200
gpm capacity, to remove copper, lead, nickel & hexavalent chromium
from printer circuit board manufacturing wastes. Special consideration
was given to accommodate limited space & close proximity to an airport
runway |
Chemical treatment of heavy
metal; vacuum filtration of sludge |
Treatability study, design,
manufacture of equipment, construction, startup & maintenance |
|
|