Project Reference
|
General Description of Project
|
|
Treatment Technologies Employed
|
Portion of Work by LEE
|
Project
Dates |
|
|
|
Start |
Finish |
Stanford Linear
Accelerator Center
(SLAC)
Stanford, CA |
20gpm CLOSED
LOOP SYSTEM |
|
|
Ion-exchange regeneration
system |
Design, equipment,
manufacturing, start-up and training |
1997 |
1997 |
Scientific Platers
Oakland, CA |
Treatment of
wastewater containing hexavalent chromium and other heavy metals |
|
|
Chemical treatment;
microfiltration |
Treatability
study; design and construction |
1992 |
1993 |
FMC
Corporation
San
Jose, CA |
Water reclamation
from clarifier |
|
|
Filtration and
electrodialysis reversal |
Treatability
study; design and construction |
1992 |
1993 |
Naval Weapons
Center
China Lake, CA |
Treatment of
plating shop wastewater |
|
|
Chemical treatment |
Treatability
study; design and construction |
1992 |
1993 |
Westinghouse
Marine Div
Sunnyvale, CA |
Treatment of
wastewater generated from steam cleaning operations |
|
|
Chemical treatment;
dissolved air; floatation |
Treatability
study and design |
1990 |
1990 |
NAS
Lemoore
Lemoore,
CA |
Heavy metal
treatment; oil and grease removal |
|
|
Chemical treatment;
and DAF for oil removal; treatment for heavy metal removal |
Treatability
study chemical analysis and economic analysis; design and specs |
1988 |
1989 |
Square D Inc.
Hayward, Ca |
Treatment of
waste containing detergent, oil, paint, and heavy metal (CLOSED LOOP SYSTEM) |
|
|
Vacuum evaporation |
Treatability
study; design and construction |
1988 |
1989 |
LIN Research
Fremont, CA |
Treatment of
wastewater containing hexavalent chrome detergent |
|
|
Vacuum evaporation |
Treatability
study; design, equipment, manufacturing and construction |
1987 |
1987 |
Associated Aerospace
Inc.
San Leandro, Ca |
Treatment of
wastewater containing hexavalent |
|
|
Chemical treatment;
sludge dewatering |
Treatability
study; design, equipment, manufacturing and construction |
1987 |
1988 |
Stockton Plating,
Inc.
Stockton, CA |
150 gpm waste
treatment plant to remove cyanide, hexavalent/trivalent chromium, copper,
nickel, lead and zinc |
|
|
Chromium reduction;
cyanide oxidation; chemical treatment for heavy metals removal |
Treatability
study; design, equipment, manufacture and installation of sludge
dewatering & drying equipment, startup & training |
1982 |
1982 |
Scientific Platers
Oakland, Ca |
Treatment of
wastewater containing hexavalent chromium and other heavy metals |
|
|
Chemical treatment |
Treatability
study; design, equipment, manufacturing and construction |
1982 |
1982 |
Fremont Wire
and Plating
Fremont, CA |
Treatment of
chromium, cyanide and other heavy metals |
|
|
Cyanide oxidation;
chemical treatment |
Treatability
study; design, equipment, manufacturing and construction |
1980 |
1980 |
Hill Air Force
Base
Ogden, UT |
Waste treatment
facility |
|
|
Chemical treatment |
Treatability
study; design, preparation of construction drawings and specifications |
1976 |
1977 |